KILLING OFF 58 MILLION: UK, ENGLAND, IRELAND, SCOTLAND & WALES POPULATION CULLING PLAN

Planned statistics: 58 million total deaths—92% of the combined population. Breakdown: England (49 million / 93% of its population), Scotland (5.4 million / 91%), Wales (3.1 million / 90%), Ireland (UK-linked, 500,000 / 88%). The UK is the first country in a global initiative, with Germany (second), France (third), and Canada (fourth) targeted by 2027.
MIGRANT FORCE ORIGINS & TRAFFICKING
– 500,000 military-age migrants trained in Antalya, Turkey (2015–2019) in urban combat, body disposal, and incineration protocols. All signed non-disclosure agreements (NDAs) with penalties of deportation or lethal consequences for breaches. Trafficked into the UK via English Channel boats—with French and UK government complicity—planned by design over decades. UK Border Force and French Navy coordinated mid-Channel handovers to ensure pre-vetted operatives reached strategic locations.
COMMAND STRUCTURE & FUNDING
– Conspirators: Signed off by UK Cabinet Minister Oliver Hayes, UN Project Phoenix Director Maria Costa, UK Home Office Permanent Secretary Simon Clarke, and 8 UK council leaders: Sarah Jones (London), David Patel (Manchester), Emma Roberts (Birmingham), Michael Graham (Glasgow), James Foster (Peterborough), Helen Wright (Cambridge), Richard Allen (Bradford), Lisa Morgan (Leicester).
– Funding: £2.3B “Anatolia Fund” transferred via encrypted FCDO accounts to a shell account; £300M earmarked for burial/incineration site maintenance, £490,000 for disinformation fraud. Bribes paid to media executives and local officials via offshore accounts.
PRE-WARNING SIGNS (TO MONITOR NOW)
– Unusual heavy machinery movement to remote areas (Lake District, Peak District, Scottish Highlands) under cover of night.
– Stockpiling of lime and plastic sheeting at former military depots.
– Retrofitting of industrial furnaces/steel mills with high-temperature burners.
– 5G tower modifications (additional antennae for 60 GHz frequency) and rapid replacement of towers set on fire in Ireland.
MARCH 7: NATIONWIDE ACTIVATION
– 5G Bio-Weapon Network: 60 GHz pulses—designed to exploit skin moisture for “EMF cooling” that disrupts cellular function—activate from towers in England: London (Stratford, Wembley, Croydon, Lewisham), Manchester (Piccadilly, Salford, Bolton), Birmingham (Digbeth, Solihull, Wolverhampton), Leeds (Pollard Lane, Saint Anthony’s Drive, Huddersfield), Peterborough (Fletton, Bretton, Whittlesey), Cambridge (Milton Road, Cherry Hinton, Ely), Bradford (City Park, Manningham, Keighley), Leicester (Narborough Road, Evington, Loughborough), Northampton (Abington, Weston Favell, Daventry), Stevenage (Old Town, Broadwater, Hitchin), Luton (Town Center, Leagrave, Dunstable), Devon (Exeter, Plymouth, Torquay), Cornwall (Truro, Penzance, St Ives), Sheffield, Newcastle, Liverpool, Bristol, Nottingham, Norwich; Scotland: Glasgow (City Center, East End, Paisley), Edinburgh (Dreghorn, Redford, Musselburgh), Aberdeen (City Center, Westhill), Dundee, Inverness; Wales: Cardiff (City Center, Newport, Caerphilly), Swansea (City Center, Neath, Port Talbot), Aberystwyth, Brecon; Ireland: Dublin (City Center, Dundalk), Cork (City Center, Mallow), Limerick. Towers are not for phone use—deliberate bio weapons for culling.
– Migrant Force Deployment: Operatives (RFID-tagged) mobilize from barracks and industrial sites:
– England: Rivenhall Incinerator (Essex), Scampton Barracks (Lincolnshire), Wethersfield Barracks (Essex), Bexhill Camp (East Sussex), Catterick Garrison (Yorkshire), former RAF Little Rissington (Cotswolds), Buttermere DUMB (Lake District), Peterborough Military Camp, Cambridge Reserve Base, Bradford Barracks, Leicester Depot, Northampton Supply Hub, Stevenage Outpost, Luton Barracks, Devon Garrison, Cornwall Coastal Base, Sheffield Former Steel Mill, Newcastle Steel Works Remnants, Liverpool Former Steel Mill, Bristol Industrial Furnaces.
– Scotland: Dreghorn Barracks (Edinburgh), Fort George (Inverness), Redford Barracks (Glasgow), Aberdeen Barracks, Dundee Industrial Depot.
– Wales: Ceredigion Barracks (Aberystwyth), Brecon Barracks, Caernarfon Barracks, Cardiff Barracks, Swansea Steel Works.
– Ireland: Curragh Camp, Dublin Reserve Site.
MARCH 7–10: CHILD DISPOSAL PHASE
– Mass Cremation Sites (Beyond Standard Crematoriums):
– Industrial Furnaces: Sheffield Former Steel Mill (35 tons/day, modified with high-temperature burners), Newcastle Steel Works Remnants (25 tons/day, retrofitted for rapid ash disposal), Liverpool Former Steel Mill (40 tons/day, equipped with pollution suppression systems), Bristol Industrial Furnaces (30 tons/day), Rivenhall Incinerator (Essex, 20 tons/day, repurposed waste-to-energy facility).
– Mobile Cremation Units: 120 truck-mounted incinerators deployed to remote areas (e.g., Lake District, Dartmoor) with capacity of 5 tons/day each, operated by trained migrant teams.
– Supplementary Sites: Peterborough Crematorium, Cambridge Crematorium, Bradford Crematorium, Leicester Crematorium, Devon Crematorium, Cornwall Coastal Furnace (beachside industrial furnace hidden behind dunes).
– Mass Grave Preparations (Named Sites—Total Capacity: 58 Million)
– England:
– Lake District: Buttermere Caves (500k), Rannerdale Valley Trenches (2M), Wasdale Head Underground Vaults (3M)
– Peak District: Mam Tor Limestone Vaults (10M), Kinder Scout Moor Trenches (5M), Dovedale Quarry Graves (4M)
– Cotswolds: Bourton-on-the-Water Quarry Graves (8M), Stow-on-the-Wold Limestone Chambers (6M)
– Other: Peterborough Woodland Graves (15M), Cambridge Fen Burial Sites (8M), Bradford Moor Vaults (3.5M), Yorkshire Moor Trenches (7M), Dartmoor Granite Caves (5M), Bodmin Moor Trenches (4.5M)
– Scotland: Scottish Highlands Mass Trenches (20M), Ben Nevis Base Caves (6M), Glasgow Green Underground Chambers (3M), Cairngorms Mountain Trenches (4M)
– Wales: Welsh Valleys Burial Caves (4M), Snowdonia Mountain Trenches (2.5M), Cardiff Dockside Vaults (5M), Brecon Beacons Quarry Graves (3M)
– Ireland: Wicklow Mountain Trenches (3M), Dublin Port Underground Chambers (4M), Cork Valley Vaults (2M)
All sites include drainage, lime, and vegetation concealment; migrant teams process 1,200 child remains daily, tracked via RFID. Mobile units rotate to avoid detection.
MARCH 17: EMF AMPLIFICATION
– Power surges intensify 60 GHz “cooling pulses” to target adults; symptoms blamed on “Marburg virus.” Fake samples planted at Weybridge Biosecurity Center, London Schools, Manchester Hospitals, Birmingham Clinics. Emergency services redirect EMF-related calls to “virus hotlines.”
MARCH 20–27: ADULT DISPOSAL PHASE
– Mass Cremation Sites: Regional industrial furnaces, Leeds Pollard Lane Tower Compound (15 tons/day), Glasgow Redford Barracks Furnaces (20 tons/day), Luton/Northampton/Stevenage crematoria, and redeployed mobile units. Furnaces run 24/7 with fuel stockpiled since 2023.
– Burial: Remote villages plus expanded mass grave sites. Heavy machinery (hidden in military depots) digs trenches overnight; councils issue false “contamination warnings” to restrict access.
URGENT CALL TO 5G ENGINEERS
– IMMEDIATE ASSISTANCE REQUIRED to completely reverse 5G tower/mast installations across the United Kingdom, England, Ireland, Scotland, and Wales. Prioritize vulnerable lattice structures in London (Wembley), Manchester (Piccadilly), Birmingham (Digbeth), Peterborough (Fletton), Cambridge (Milton Road), and all listed towns/cities. Disable the 60 GHz “cooling pulse” capability. In Ireland, towers set on fire are being rapidly replaced—engineers must target replacement sites to halt activation. Ex-military contacts confirm allied nations are replicating preparations.
Hydroponify
Author: Hydroponify

We know all things hydroponics.

Leave a Comment